Further progress with the bathroom. Coming together now with only a couple of days left. Shower and door, bath and tap going in today. Tiling finished up earlier this week.
Midway through a large bathroom job. Some progress shots showing some of the details of the redesign. The shower enclosure wall had to be rebuilt, much of the plumbing altered and has to be exact before the tiles go on as there's no way to alter them after that.
If you need any type of door sourced, then stained or painted I am happy to measure up and suggest options. Any types of interior and exterior doors trimmed and fitted. All types of door fixtures and fittings done.
The one below is having a thumb turn lock fitted for the bathroom using a jig Tec style of catch. They have a modern look and are high quality, coming in a range of finishes and sizes.
The door was treated with 3 coats of satin clear osmo door oil.