top of page

Short stories about my daily life as a handyman with photos, descriptions of my works and occasional tips and tricks

My Blog

Writer's pictureDavid Sweeney

Just finishing up a kitchen facelift. Myself and customer very pleased with the finished job. Work included: new tiles, new hob, extractor, and oven, new sink and taps, new flooring with resized plinths, new mouldings on the cupboards and a lick of paint.


Writer's pictureDavid Sweeney

Recently completed some bespoke floating shelves for an alcove. Each approx. 85mm thick and painted acrylic eggshell. Get in touch if you need something similar.


Writer's pictureDavid Sweeney

These are the after photos of the bathroom I've been working on. The before photos were published in a previous post. It included all walls and ceilings replastering and painted, timed fan installed, tiled bath and floor areas, new bathroom suit, new towel radiator, and a freestanding sink and vanity unit.


Recent Posts
Archive
  • Instagram Social Icon
  • Facebook Basic Square
  • Twitter Basic Square
bottom of page